Monday, June 15, 2009

TRANSFORMER TESTING AT SITE

Everyone knows before commissioning or charging any equipment it must be need to test before putin to service, like that the new transformer is also need to ensure everything is fine. So, some tests are required to confirm. those are all called Pre-commissioning tests.some important tests are mentioned here for easy ref,

i) Insulation Resistance or Meggar Value with PI (Polarization Index)
ii) Turns / voltage Ratio
iii) Magnetic Balance
iv) Magnetizing current
v) Oil tests (BDV, PPM and DGA (for future ref))
vi) Protections (Differential, IDMT, Bucholz Relay,OTI, WTI, PRV, OSR, MOG, Fans and pumps)
vii) Operation of OLTC or OCTC/OCKT
viii) Vector Group Test

Testing methods will be described in next post.

TRANSFORMER TESTING

As per IS 2026 the following Routine tests are carrying out in transformers at testing stage.
1. Measurement of Winding resistance
2. Voltage Ratio/ Ratio Test
3. Measurement of Impedance voltage/ Short Circuit impedance
4. Measurement of NO-Load loss and current
5. Dielectric tests (Induced Over Voltage and Separate Source Voltage)
6. Magnetic Balance and Current
7. Load Loss
8. Insulation Resistance
9. Vector Group
10. Oil BDV
11. Capacitance and Tan delta

Tests at site will be discussed in next post.